- •Term Paper
- •Automatic control of the center of mass in the horizontal plane
- •Systems of co-ordinates, applied in navigation complexes
- •Methods for determining the coordinates of the location of aircraft. Structure of a typical navigation system
- •Management practices the center of mass of aircraft on the route
- •The composition and control laws acs
- •The dynamic properties of the system, "acs - the plane" in trajectory control in the horizontal plane
- •The work of acs in continuous-path mode in the horizontal plane
- •Speed control of flight
- •The influence of external disturbances on the control of the aircraft in the horizontal plane
- •Automatic control of the flight altitude
- •Control laws and the principle of automatic control system for managing the flight altitude
- •The dynamic properties of the system, "acs - airplane" mode of stabilization altitude
- •The influence of external disturbances on the control loop height
- •4.Automatic control of the airplane during landing 4.1. Means of providing landing
- •4.2. Control of the airplane during landing
4.Automatic control of the airplane during landing 4.1. Means of providing landing
Currently, the most widely used radio system tasks approach path type SP-50 (ILS), PRMG-4, etc. In these systems, the approach path is the line of intersection of the planes of the course and glide path to reduce generated foreign exchange (MRC) and the glide path (RM), beacons, respectively. This line represents the beam. Deviation of the aircraft from the board of the beam are determined by foreign exchange (PKK), and the glide path (HF) radios. Thus, to a range of special equipment to ensure planting include: • ground track, glide slope and localizer RM; • ground marker, joined at the location on the far (DPRS) and near (BPRS) NDB. Marker used to indicate the time of their flight; • board of course and glide slope receivers PKK fracturing; • on-board information systems: low-altitude radar altimeter, compass system, the attitude indicator, automatic control system and the system of director of management. CRM and SRM give signals proportional to the angular deviation of the aircraft from equisignal zones in the polar coordinate system with the poles, combined with the location of the corresponding beacon. ACS based on the statistics and realized it carries stabilizing control laws of the aircraft relative equisignal zones CRM and SRM.
The layout of ground system SP-50 is shown in Fig.
Functional
diagram
avionics
instrument
landing
system
is
shown in Fig.
Crucial
role
in
the management of
computer
plays
trajectory
control
(WTU),
forming setpoint
signal
pitch
and roll angles
(overloading),
depending on
the angular
deviation
of
the aircraft from
equisignal
zones
and
.
4.2. Control of the airplane during landing
Planting process can be divided into the following stages: • return the aircraft at the aerodrome; • preplant maneuvering in the terminal area; • approach (preplant maneuver within range of CRM and RM); • proper fit (alignment steps and landings). Return aircraft preplant maneuvering and approach can be performed in an automatic, semi-automatic (-director) or manually. Proper fit, as a rule, in the manual mode. Control of the aircraft to return to the stage of TMA preplant and maneuvering (mode "Return")
The objective of the aircraft in the "Return" is the conclusion of its air space to a point relative to the aerodrome in such a way that it lies on the extension of the runway at a height and distance. Enabling can be either automatic (after the passage of the last MRP) and manually (by pressing a button - light return). In the "Return" ACS provides direction and maintaining the descent path, specified equipment RSBN. Maneuver the aircraft is in the horizontal and vertical planes. A rectangular coordinate system associated with the aerodrome landing. Control in the horizontal plane. Process of going to the airport landing includes generally three stages.
At
the first
stage,
the
output
of
aircraft
in
the terminal area
to
the line
defined
by the
range
of
200
... 250
km
to the
beacon
RSBN.
CND
and
ACS
also
function
as
a
cross-country
flight,
just as
the
MRP
is
programmed
RSBN
airfield.
Control
of the airplane,
as a rule, foreign
exchange
method.
Given
course
is
formed depending
on
the distance
to
the
airport
landing
and
the direction
of
approach.
The
second
stage
begins
when the
turn
of
the
airfield
area.
In
occurs
automatically
if
serviceability
airborne
and ground equipment
systems
RSBN.
In
contrast to
the
first stage
at
this stage is
the
calculation of
the
true course
set
to
return to the
set
point.
As
specified
points
are
conditional
points
C2
and
C3
(third
turn point)
and the point C1
(point
fourth
turn),
located in
a certain way
with
respect to
the
aerodrome.
Feature
functioning
NCP
at
this and
subsequent
stages of
planting
is
to use
the
Cartesian coordinate system
,
related
to
airport
landing
and
starting
at the
center
of
the
runway.
Point
C1
is
given
by the point
in
the case,
if the plane at
the turn of
the
airfield
area
was
in
quadrants
I
and
II
(exchange
rate
differed
from
aircraft
landing
at
least
900).
From
the measured
azimuth
and
slant
range
to
ground
beacon
calculated
the
coordinates of the
location
of
the
aircraft (
,
).
The
current coordinates
are
used
to
determine the true
rate
specified
airplane
flight
and
distance
to
it
according
to the expression
;
,
where,
-
programmed
tc
airport
landing,
(
,
)
–
coordinates
of the target.
If the output at the point where the third turn (the plane at the turn of the zone is in quadrant III or IV), then the distance to it, equal to the radius of rotation (4 km), there are redirected to a point of the fourth turn. Control of the aircraft at this stage is also carried by foreign exchange. The third stage begins at the intersection of 5,5 - km corridor relative to the runway. From this point on the given course is formed using conventional fixed point, which is moving along the runway at a distance of 2.5 km from the projection of the plane on the runway axis. When such control is a smooth transition to the runway axis.
At the entrance to the plane in the area 1.5 km by lateral deviation from the runway RSBN automatically switch to receive signals and timing of MRC, while issuing a command to a one-time transfer of ACS to "Landing". Thus, the construction of the trajectory maneuver in the horizontal plane is characteristic of course the output method to a given point. The parameters of the given points, and control signals are provided to certain algorithms used in calculators navigation system.
Control in the vertical plane. The distance from the aircraft to the appropriate set point program formed a trajectory in the vertical plane. The trajectory is a broken line consisting of three straight sections of the flight at a cruising altitude of 10.5 km reduce land with a slope of 60, called Penetration clouds. In this part of the specified height is formed depending on the distance to the zone preplant maneuver by the formula
,
where
-
distance
to
a point
determined
by
the expression;
=16
km
for
point
C1
and
8
km -
for
points
C2
and
C3;
at an altitude maneuver preplant = 630 m.
ACS provides a longitudinal channel defined aging aircraft flight profile deviation stabilizer. In the case when "Back" is on at high altitude and a small distance from the airport, the points C1, C2, C3 are displaced in the runway of the airfield to a distance at which the reduction will occur with the calculated angle of the trajectory. Thus, in the "Return" is provided by the output plane on the shortest path to the zone of the landing beacons RSBN with a reduction to the height of preplant maneuver. The ultimate goal is to derive preplant maneuver the aircraft in such a region of airspace where there is sure "grip" airborne signals MRC and timing.
Control of the airplane during landing approach Approach - it preplant maneuver the aircraft within range of CRM and SRM. The objective of this phase is to provide a precise conclusion on some aircraft to the runway threshold from which limited visibility would do well to finish the pilot landing manually, visually oriented.
After
3
...
5 s
after
entering
the
aircraft
1.5
-
km
corridor
relative
to
the runway
and
the
stability of the
CRM
and
SRM
NCP
goes
to
interact with
ILS
landing
PRMG
group
(including
CRM,
SRM
and
planting
repeater
rangefinder)
on
and off
from
the interaction with
RSBN
ground
beacon.
ACS
goes
from
mining
mode
to
stabilize
the
aircraft
LZP
-
on
the
runway
-
the
signals
of
the beam
deviation
from the
MRC
.
To
this end,
the
trajectory
calculator
circuit
roll
channel
ACS
generates
in
law
.
Signal
is
the primary
control
signal,
which
is similar to
the
signal
lateral
deviation
,
because
at
small
linear
lateral
deviation
of
the aircraft from
the
runway
is
defined as
,
where
-
current
distance from the
aircraft
to the
localizer.
Signal
by
analogy
with
the signal
provides
damping
of
oscillations
of
large
lateral
movement.
Inertial filters provide filtering high frequency noise in the signal and its derivative .
ACS longitudinal channel crossing timing of the beam generates a control signal given excessive overload or given pitch angle, for example, the laws of
;
.
Expressions
main
control
signal
equivalent
signal
,
and
the signal
like
provides
vibration
damping
large
longitudinal
movements.
An
important feature of
the
contours
of
the trajectory
control
laws
is
the
variability
of
their dynamic characteristics,
depending on the distance
to the
beacon
and
.
At
constant values
of
the coefficients
of
control laws
at
large distances
from
the runway
for
small deviations
and
angular
deviations
and
also
small,
small,
respectively, and control signals.
Transients
sluggish.
As
you approach the
runway
distance
to
the corresponding
beacon
decreases,
and signals
and
under
the same
mistakes
and
increase.
This can result in
an
increase
of
the oscillatory process
control
and
even
the loss of
stability
of
the
circuit.
Therefore
auto-director
or
management
have
to disable.
Thus,
providing
automatic
landing
gear
ratios
requires
regulation
control
laws
depending
on the distance
to
the runway.
In
some
onboard
complex
software
used
method
of changing the
coefficients
of
control laws.
So
in the
ABSU-154-2
and
a
reduction in the
time
constants of the
roll
channel
is
discretely
on
the command "Capture
glideslope"
and "H-250 m,"
and pitch
channel
Command
altimeter
"H-250
m"
and "H-100 m."
At
a height of
30
m
off
the
automatic mode
and
a further
approach
is
carried out
manually.
