- •Laboratory work №4.6
- •Automation of statistical computing
- •In Mathcad to determine the sample variance stored in the matrix X, intended the function var (X) - sample variance, and the value of d can be calculated by the formula:
- •Variance and standard deviation (two methods of calculation).
- •Picture 2.3- Solutions Example 2.2
- •2. The duration of the operation of electron tubes of the same type (the times)
- •3. Measuring the capacity of 80 field-effect transistors
- •6. Given a sample mass of steel billets (g).
- •4. Hour of recovering diodes from the same batch (nanoseconds)
- •5. The hours of reaction (in seconds):
- •7. Changes of the limits of the strength on break for the steel sheet
- •8. The depth of the diffusion layer, defined by the sample from the party of the chips, has the following values (μm)
- •9. At a given current of 10 mA was measured direct voltage drop on the diodes Obtained the following values (volts)
- •10. Measuring the mass of a substance as the result of a chemical reaction (g)
- •11. The productiveness of the Department within 20 working days was characterized by the following numbers (in conventional units)
- •12. For 24 details was obtained the following deflection of control size from the nominal value (μm)
- •13. Measured resistivity in the sample batch of chips after doping the polysilicon
- •14. Data on the average number of family members
- •15. Given the following data on the yields of wheat
- •16. Data about tariff rank of 50 workers of one of the department of the plant
- •17. The output of services by category (2010/2009%)
- •18. Interest rates on loans (collateral loan, %)
- •19. The average population growth (cm)
- •20. The importance of the results on a 10-point greatest scale
- •21. The structure of gdp(gross domestic product) in 2000 and 2010 (industry - construction)
- •22. The fact of the execution of the plan by the company by product types (th.Units)
- •23. Data about the value of fixed assets of 50 enterprises
- •24. The dynamics of power consumption 24 1990 2010 (gw.H)
- •25 Coefficient of work motivation
2. The duration of the operation of electron tubes of the same type (the times)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
13.4 |
|
17.7 |
15.2 |
15.1 |
|
13.0 |
|
|
21.9 |
|
14.0 |
|
17.9 |
|
15.1 |
16.5 |
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
14.2 |
|
16.3 |
14.6 |
11.7 |
|
16.4 |
|
|
15.1 |
|
17.6 |
|
14.1 |
|
18.8 |
11.6 |
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
18.0 |
|
|
12.4 |
17.2 |
14.5 |
|
16.3 |
|
|
13.7 |
|
15.5 |
|
16.2 |
|
8.4 |
14.7 |
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. Measuring the capacity of 80 field-effect transistors
1.9 |
3.1 |
1.3 |
0.7 |
3.2 |
1.1 |
2.9 |
2.7 |
2.7 |
4.0 |
|
|
|
|
|
|
|
|
|
|
1.7 |
3.2 |
0.9 |
0.8 |
3.1 |
1.2 |
2.6 |
1.9 |
2.3 |
3.2 |
|
|
|
|
|
|
|
|
|
|
4.1 |
1.3 |
2.4 |
4.5 |
2.3 |
0.9 |
1.4 |
1.6 |
2.2 |
3.1 |
|
|
|
|
|
|
|
|
|
|
1.5 |
1.1 |
2.3 |
4.3 |
2.1 |
0.7 |
1.2 |
1.5 |
1.8 |
2.9 |
|
|
|
|
|
|
|
|
|
|
