Introduction;
CGR №1. Determination of the annual electricity demand of a given region:
- construction of winter and summer daily diagrams of electrical load of the power system;
- determination of the maximum power capacity of the power system's power plants and selection of the main equipment at various types of stations to cover the region's load.
CGR №2. Ownership of the power plant (ES), selling prices and tariffs:
- determination of the share of power stations in covering the schedule of loads of the energy system and the construction of daily working schedules for EPO;
- calculation of the cost of electricity production at various types of stations;
- determination of EPO selling prices and forecast tariffs for electricity transmission and distribution services in the national electric grid (NES) and regional electric grid companies (RECs).
4 Calculation and graphic work 2
Power stations and blocks |
Given power, МВт |
HPS |
|
HPS №1 |
67 |
HPS №2 |
44 |
Sum OF N HPS |
111 |
TPS |
|
TPS №1 |
204 |
TPS №2 |
153 |
TPS №3 |
153 |
Sum OF N HPC |
510 |
CPS |
|
CPS №1 |
648 |
CPS №2 |
432 |
SUM OF N CPS |
1080 |
4.1. ES equity participation, selling prices and tariffs
For HPPs, the main component of costs is depreciation, which we assume to be 40%. Having found the depreciation, we find the remaining costs, respectively, equal to 60%.
Cost of production at HPPs
depreciation
costs;
other costs
(wages).
Capital expenditures for HPPs
unit costs
for HPPs;
continuously
output power.
Кгэс1=1200*337*67*106= 27094800*106
Кгэс2=1500*337*44*106= 22242000*106
Table 4.1 - Specific capital costs for 1 кВт
$ |
1200 |
1500 |
Tenge |
404400 |
505500 |
Course to the Tg $ |
337 |
337 |
Cost of depreciation
the norm of
annual costs for depreciation and maintenance of networks, we accept
3%.
Zam=27094800*106*0,03=812844*106
Zam=22242000*106*0,03=667260*106
The cost of electricity at HPPs
где
total costs per day (wages / 365 days a year)
Wгэс1= 67000*4=268000
Wгэс1=67000*0,1*24=160800
∑ Wгэс1=428800
Wгэс2=44000*4=176000
Wгэс2=44000*0,1*24=105600
∑ Wгэс2=281600
Amortization costs per day:
Zгэс1=812844*106/365=2226.97*106
Zгэс2=667260*106/365=1828.11*106
Costs for depreciation:
ГЭС1=5193.49 tg/kWh
ГЭС2=6491.86 tg/kWh
Total costs:
Zгэс1=2226.97*106/0,4=5567.43*106
Zгэс2=1828.11*106/0,4=4570.28*106
Cost price:
Sгэс1=5567.43*106/4.28800=1298.38 tg/kWh
Sгэс2=4570.28*106/2.81600=1622.97 tg/kWh
Cost:
Цгэс1=1,1* Sгэс1=1298.38*1,1=1428.22 tg
Цгэс2=1,1* Sгэс2=1622.97*1,1=1785.27 tg
Table 4.2 - Results of cost indicators for HPPs
Calculation self.\ P.P. |
HPP 1 |
HPP 2 |
Power of HPP1, МВт |
67 |
44 |
Constant given power, МВТ |
6.7 |
4.4 |
Specific capital costs, tenge |
404400 |
505500 |
Capital expenditures, tenge |
27094800*106 |
22242000*106 |
Costs for depreciation, tenge |
812844*106 |
667260*106 |
Expenses for other expenses, tenge |
3362990.4*106 |
2802492*106 |
Cost, tenge |
1298.38 |
1622.97 |
The average specific fuel consumption per unit produced by power plants, кг. у.т./кВт∙ч.
For the CHP plant, the efficiency factor is taken to be 0.4-0.5 regardless of the time of day - the CHP covers the base part of the load schedule and operates in a conditionally-continuous power delivery mode. Since IES operates in the load-schedule control mode, then, correspondingly, over the course of a day, the IES efficiency changes. Thus, in the zone of the failure of the KES efficiency, it is assumed to be 0.3, and in the peak 0.4.
Natural fuel consumption
,
To simplify the calculations, let's assume that the fuel cost
component is 50%. Then
the total cost price
The cost
price of fuel (taking into account the price of ex-consumer)
Calculation
of the cost of electricity production at TPP 1
Calculation
of the cost of electricity production at TPP 2,3
Calculation of the cost of electricity production at CPS 1
Calculation of the cost of electricity production at CPS 2
Further calculations are carried out in a similar way, the results are summarized in Table 4.3.
Table 4.3 - Forecast sale prices from tires
Selling price |
|
HPP 1 |
12983.73 |
HPP 2 |
16228.69 |
TPP 1 |
3,82 |
TPP 2 |
4,774 |
TPP 3 |
4,774 |
CPP 1 |
6,36 |
CPP 2 |
4,774 |

тенге/кВт
ч