- •Перекрытие или определенный?
- •Epcm против консультантов
- •Предложение процесса
- •Привлечение других участников
- •Разработка Jacobs
- •Xstrata, Ресурсы Teck и Мицубиси. Оба из
- •Проекты Минерала dra
- •Группа mdm
- •Technip
- •Разработка
- •Overarching or specific?
- •It is not just about size, but also ability to
- •Epcm versus consultants
- •In a raise boring specialist, the relationship
- •Tendering process
- •Is often a secondary factor, particularly in the
- •Attracting other participants
- •It is also the case that companies that had
- •Incorporates a state-of-the-art, 7 million litres/d,
- •Include mining and mining infrastructure,
- •Jacobs Engineering
- •Dra Mineral Projects
- •Mdm Group
- •Infrastructure capabilities. Cluroe comments:
- •Technip
- •Engineering
Epcm versus consultants
The lines between the fabricator, erector,
consultancy, finance, operational and project
management companies are definitely
becoming less defined. Much of this is driven
by different client circumstances and needs. It
is also the case that EPCM contractors
recognise that they do not have to perform the
customer’s entire project delivery phases
themselves and will bring other specialist
contractors into a project to carry out specific
technical work as and when required. As
such, there is often a very close synergy
between consultants and contractors.
Digby Glover at TWP comments: “There is acontinuum of options from the wellestablished
client, who want a large degree of
control and who only need specific consultancy
input – right through to the newer player, who
does not have capital, who requires a company
to finance design, build and operate a mine.
TWP, and its parent company Basil Read, have
strategically positioned themselves to provide
most of these services along this continuum.
Our clients have the flexibility to pick their
required services, or to use all of them.”
Bennett at MDM comments: “There is a
relationship between these groups where the
EPC/EPCM contractor will sub-contract certain
skills in a study like the EIA, tailings dam
design, resource and geology statements, mine
plan and schedule; and on actual projects we
will often sub-contract the SX-EW portion of
the plant, for example. We do find some of
these groups blurring the lines as some of
them take on whole studies but do not do the
plant design for example and some of these
groups do small jobs but come to us for the
bigger or main project, so they may try and
built a pilot plant but cannot do the main
project/plant.”
Should a consultancy be sub-contracted by
the main EPCM contractor to carry out a
particular part of the project such as bringing
In a raise boring specialist, the relationship
between EPCM/EPC companies and the
consultant is one of subcontracting for the
best competencies at the best price to the
mining customer, with a single and simplified
line of responsibilities and communication
between the customer and the prime
contractor.
A spokesperson at AMEC commented: “A
challenge for all EPCM projects is to clearly
define and communicate the scope and
objectives to all project participants, and build
a cooperative, well-functioning team. This is
critical to managing the complexity and
multiple interfaces of any sizeable project.”
They added: “The components most usually
missing in other EPCM providers are the earth
and environmental sciences, and capabilities in
resource geology, and typically they or the
owner would contract other specialist firms for
these service components.”
Tendering process
Capability and capacity are considered.
Generally a strong track record is required in
the specific market area to demonstrate
capability. Price will always be a factor, but this
Is often a secondary factor, particularly in the
front end loading phases of a project.
Leon Uys, Managing Director at DRA
MIneral Projects, comments: “The tendering
process for projects has remained much the
same with companies bidding mainly on
factors such as price, capability and track
record. However, this is not the case when
DRA offers a ‘total solution’. In this instance
the company will open its books to the client
and agree up front on key aspects such as
profit margins and incentives.”
A spokesperson at Jacobs Engineering
comments: “In general, there can be a prequalification
process to identify a short-list of
the most qualified companies prior to the
formal bid process. Companies are expected to
present a complete response to a customer’s
formal Invitation to Tender, which typically will
include the proposed project team, a detailed
scope of work, cost estimates and overall
project execution programme that relate directly
to that scope of work. Previous references are
very important to demonstrate a company’s
ability to undertake the work. Often, these
include specific examples of previous project
experience in a particular geography or mineral
that relate to the customer’s project.”Chinese influence
Major Chinese mining groups generally have
some EPCM capability and are currently mainly
operating in regions such as Australia/Asia
Pacific and South America. Therefore, there is
increasing competition in particular for projects
owned by Chinese customers or utilising
Chinese investment funds. Julien Denegre at
Technip comments: “Chinese investors have
more success getting Australia's mining sector
investment approved in the future because
they now understand how to navigate the
process. China's commercial ties with Australia
have been marred by controversy, with
Canberra rejecting some takeover bids by
Chinese state-owned firms. Chinese investors,
in turn, have complained of confusion over the
foreign-investment regime. The total
investment over the last three years out of
China into Australia is huge across a range of
commodities, from magnetite to coal, to
uranium and LNG. Australia has been the
biggest target for Chinese investment over the
past five years, with direct investments worth
more than A$16 billion, according to
Australia's Treasury Department.”
Chinese groups are used to working in
partnership with EPC Chinese engineering and
construction firms to design and build project
facilities, not only to enhance international
competitiveness but also to effectively reduce
planning and material sourcing risk.
Cluroe at Hatch adds: “There’s no doubt
that country players are making moves,
especially in their home markets. The Chinese
design institutes have a lot of local knowledge,
and obviously local connections, so they’re
playing an increasingly important role too. We
often work with these local players and these
joint ventures can be a powerful combination
to execute projects that deliver value to the
client. And that’s our ultimate objective.”