State capital investments

2

Financed by the state budget or the budget of state enterprises and organizations, as well as the local budget.

A set of measures to ensure the loading capability of structures and buildings.

A set of measures to ensure the weakening structures of buildings.

A set of measures to eliminate the structures of buildings.

A set of measures for the destruction of the building structure.

1

In which of the following cases on construction sites issued field disigner supervision log

20

In any case.

If the need for disigner field supervision established by legislation.

If the customer signed a contract with the progect organisation to conduct field supervision.

Not issued.

If the customer signed a contract with general project organization to conduct field supervision

1

The contractor refuses to sign the act of acceptance of work due to financial disputes with the customer. What are the possible actions of the customer in this situation

20

Customer invites Stroy inspection supervision for the joint signing of the acts.

Customer signs the act and makes it mark on the refusal of the contractor to sign the act.

Customer shall submit the case to court.

Customer shall submit the case to the Ministry.

Customer shall submit the case to the Department for Construction.

1

State centralized capital investments

2

Investments aimed at the creation and renewal of fixed assets and funded from the state budget or budget loans.

A set of measures to ensure the loading capability of structures.

A set of measures to ensure a weakening of structures.

A set of measures to eliminate the structures of buildings.

A set of measures for the destruction of the building structure.

1

Work pack includes

1

General explanatory note to the specifications and drawings; organization of construction; construction documents; working draft passport.

Dismantling of process equipment.

Forms of production organization.

Methods of work.

Project and work documentation.

1

The customer receives permission to geological search

2

At the headquarters of Geodesy and Cartography (GUGK).

At SMO

The department estimated pricing.

In the department of investment policy and tariff regulation.

In the department of housing policy.

1

What is the scope of work

4

The space occupied by the object under construction, together with a team of mechanisms, devices and materials.

Harvesting of parts, assemblies.

It is a choice of mounting cranes and lifting devices.

Delivery of materials on construction project site.

Site Preparation for assembly.

2

What is the name of land allocated to one worker, team

4

For one worker - plots, For the brigade – Grabber.

Spatial cell.

Section.

The berm.

Object.

2

What are the main indicator for assessing the work of builders

4

Poductivity.

Pricing.

Cost price.

Tariff rate.

Tariff rate coefficient.

2

Compressed air is used in the construction

7

When using pneumatic equipment (cement-guns, hammers etc.)

During operation of tower cranes.

Truck cranes.

When using bitum truck.

At work of Hydraulic Excavator.

1

Mobile compressor stations, producing compressed air and have capacity

7

3-9m3/min.

12m3/min.

0,3m3/min.

0,9m3/min.

1,0 m3/min.

3

The investor is

8

Legal and natural person who owns their own and borrowed funds allocated for construction, reconstruction or repair of buildings and structures and interested in the return on their investment and insurance.

Legal and natural person who is not in possession of own and borrowed funds.

Client.

Bid Engineer.

Engineer-Controller.

3

Work, unrelated, must be carried out

9

Parallel and independently.

Combined.

Manually.

Complex-mechanized.

Automated way.

3

Construction of residential buildings are usually planned

9

In three cycles: the construction of underground, above-ground and organization of finishing works.

In one cycle: the construction of underground, above-ground parts.

In two cycles: the construction of underground, above-ground parts.

In four cycles: the construction of underground, above-ground and organization of finishing works.

In one cycle: organization of finishing works.

3

Excavation of a residential building is usually performed by

9

Excavator with bucket capacity 0,33-0,65m3

Excavator with bucket capacity 0,25m3

Rotar excavator.

Scrapers.

Motor graders.

1

The parameters of the network schedule to be calculated are

11

The duration of the critical path (Тcp); early start of work (ti-je.s); earlier end of the work (ti-je.e)

Calculation of events.

Payment of receipt mechanisms.

Calculation of the choice and means of transport.

Calculation of the amount of transport.

1

The main task of MTSP (material and technical support of the project)

12

Ensuring availability of equipment and materials for the project in strict accordance with the project schedule.

The choice of the form and means of transport, depending on the main circuit of the machine.

Ensuring availability of equipment and materials for the project regardless of the project schedule.

Determine the cost of equipment and materials for the project.

Determination of the parameters of the network schedule.

2

Non-government capital investments

2

investments financed by investors from non-state ownership.

A set of measures to ensure the loading capability of structures.

A set of measures to ensure a weakening of structures.

A set of measures to eliminate the structures of buildings.

A set of measures for the destruction of the building structure.

2

What are the main methods for quality control of construction works

13

Visual inspection, the actual measurement of linear dimensions, full-scale test methods, mechanical (destruction)

Physical (non-destructive)

Not controlled.

As per limit card.

On the consolidated statement.

By picking list.

1