- •Test questions for discipline «Architecture-1» Speciality: 5b072900- "Construction". For 2014 academic year.
- •Placing an order is
- •The tender documentation is
- •State capital investments
- •State centralized capital investments
- •Mixed capital investments
- •Construction it is-
- •Design is conventionally divided into
- •Economic effect compared alternatives of building structures calculated by the formula
- •Calculation of economic benefit, is performed by the formula
- •Ratio is the overall efficiency for the enterprise
- •Effect in the production
- •Launch Complex
- •Construction project
- •Production of construction industry
- •Construction as a sector of the economy involved...
- •Investor —
- •Continuous visual inspection of structures and identification of external signs of damage. Continuous visual inspection of buildings and identification of external signs of damage.
- •Investors have ...
- •Determine the necessary geometrical sizes. Continuous assessment tool building.
- •The customer is ...
- •Familiarization with the technological map of the building.
- •The builder is different ....
- •Determine the necessary geometrical sizes. Continuous assessment tool building.
- •Main contractor
- •Scheme and the statements of defects and damages with fixing their places and nature. Descriptions, drawings, photographs of defective sites.
- •Organizational forms of construction:
- •Only solid.
- •Incomplete.
Production of construction industry
3
Are completed construction and commissioned factories, railways, roads, power plants, irrigation and navigation canals, ports, houses and other objects that form the basic foundations of the economic sector of the country.
Familiarization with the documentation, training materials and preliminary measurements.
Are unfinished construction and put into operation factories.
Familiarization with the documentation, familiarization with the testing and pre-measured.
Familiarization with the documentation, training material and familiarization with the testing.
2
Construction as a sector of the economy involved...
3
In creation of fixed assets for all sectors of the national economy.
Earthworks, concrete and stone work.
Shoring and concrete works.
Earthworks and masonry work.
Greening works.
3
Where should be Project author supervision log, during construction of the facility.
20
At client.
In the project organization (author of the project).
At contractor.
At contractor at the construction site.
At subcontractor.
2
In the construction process can be highlighted three phases:
3
1) preparation of construction; 2) construction; 3) implementation of construction products.
Only the performer survey.
Only by contractor.
Only by client.
Only by project organization.
1
Current expenses
3
It is all construction company costs.
it is all customers' costs.
It all performers' costs.
Project organization.
Public authorities.
1
Economic ties construction sector with other sectors of the national economy, provide services called ...
3
Intersectoral.
Transnational
Investments.
GOST12730.0
GOST 10060.4
1
Investments in capital stock-
3
Total costs allocated to the creation, reproduction and acquisition of fixed assets by the new construction, expansion, reconstruction, modernization of objects, the acquisition of buildings, structures, machinery, etc.
Work on measurement of geometrical parameters necessary buildings using geodetic instruments.
Work on measurement of geometrical parameters necessary structures using geodetic instruments.
Work on measurement geometric parameters required elements with the use of surveying instruments.
Work on measurement geometric parameters required nodes, using surveying instruments.
2
Engineers and office workers at the construction site constitute of the total number of workers
20
10%
2%
25%
50%
23%
3
In developing the schedule after selecting the working procedures and the calculation complexity of embarking on Establishing
20
Sequence of work.
Construction time.
Schemes of work.
The number of workers.
Number of shifts.
4
The cost of land, the cost of transportation of raw materials, fuel, energy costs, water, taxes, insurance itd these costs are determined by
2
Economic survey.
Geodetic surveys.
Engineering surveys.
Environmental studies.
hydrogeological studies.
5
Based on environmental surveys makes
2
Analysis of ground, air, soil, water, plants, hazardous substances etc.
License.
Environmental Passport.
KP
WPP.
5
Based on environmental surveys customer issue
2
License and environmental Passport.
Analysis of ground
Analysis of air.
Analysis of soil.
Analysis of water.
5
How classified construction processes on technological characteristics
4
Procurement, transportation, preparation, installation-lying.
Shoring, concrete.
Excavation, masonry.
Greening works.
Block, separate mixed.
5
Stroygeneralplan is an important document
5
Project construction organization.
Technical report.
Design and survey works.
Cost estimates.
Branded estimate standards.
5
Usually stroygeneralplanas developing separately for the periods
5
Preparatory work, zero cycle, the construction of the main structure of the building above ground
Decoration works.
Floor installation.
Arrangement of partitions.
Unit cement screeds.
2