Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
DLYa_PEREVODA_PS_Oktyabrskaya_en.docx
Скачиваний:
0
Добавлен:
01.07.2025
Размер:
543 Кб
Скачать
☆

35.1 Special requirements 79

35.2 GIS – 330 кВ и GIS – 110 кВ 80

35.3 Terminators of overstrain 88

35.4 Shield of own needs 0,4 kV 89

35.5 Shield of direct-current 220 V 90

35.6 Cables and cable trays 92

35.7 Power cables 92

35.8 Control cables 93

35.9 Requirements to the equipment HF treatments for organization HF ducting’s on WL (HF minelayer, condensers of connection) 94

TECHNICAL DATA SHEETS FOR PRIMARY EQUIPMENT AND INFRASTRUCTURE 96

36. Assortment and quantity 96

Technical Data Schedules Description 96

37 Information about a nomenclature and amount of the required equipment, materials, wares 97

37.1 Information about a nomenclature and amount of the required high-voltage equipment and equipment of own needs. 97

37.2 Information about a nomenclature and amount of the required materials (wires, cables and terminal closets) 97

37.3 Information about a nomenclature and amount of the required devices of instruments and adaptations 98

38 Tables of technical information 98

38.1 Expls to the tables 98

38.2 Technical requirements to GIS - 330 kV 100

38.3 Technical requirements to GIS – 110 kV 103

38.4 Technical requirements to the terminator of overstrain 330 kV 109

38.5 Technical requirements to the terminator of overstrain 110 kV 111

38.6 Technical requirements to the shield of own needs 0,4 kV 113

38.7 В Technical requirements to the shield of direct-current 220 V 113

38.8 Technical information of high-frequency minelayer for WL 330 kV 114

38.9 Technical information of condensers of connection for WL 330 kV 115

38.10 Technical information of high-frequency minelayer for WL 110 kV 115

38.11 Technical information of condensers of connection for WL 110 kV 116

III. Special technical requirements to relay protection and automation system 116

39 General 116

39.1 Scope of Work Overview 117

39.2 Contractor`s Duties 117

39.3 Dismantling 118

39.4 Training 118

39.5 Operational Conditions 119

39.6 General Design Requirements 119

39.7 Requirements to Microprocessor Devices Regarding External Interface 120

39.8 Software Requirements 120

39.9 Requirements to Control Cables 121

39.10 Spare Parts and Special Tools 121

39.11 Warranty Maintenance 122

39.12 Requirements to Methodology Buidelines Regarding Selection of Setting for Relay Protection and Special Automatics 122

40 General Functional Requirements to Elements of Relay Protection and Special Automatics System 123

40.1 Devices of Protection of Automatic Transformers 330 kV for AT with Phase Shifting Transformer 124

40.2 High-frequency transceivers for basic differential-phase defense of line on a microelectronic element base 124

40.3 Complete set of reserve defense of WL-330 kV (on the controlled from distance and current principle) with the function of ARI ( automatically the repeated including) , DBRS ( device of backuping at the refuse of switches) 124

40.4 Complete set of automation of management a switch 330 kV with the functions of DBRS, ARI 125

40.5 Complete set by a basic differential-phase HF defense of WL-110 kV with the functions of reserve defense 126

40.6 Complete set of basic differential defense of WL-110 kV (transmission of signal on fibre-optic communication line) with the functions of reserve defense 127

40.7 Complete set of defense WL-110 kV (on the controlled from distance and current principle) with funk-ciey DBRS,ARI 128

40.8 Complete set of defense CS(connecting switch) -110 kV, BCS(bus connecting switch )-110 kV on current principle with the function DBRS 129

40.9 Complete set of automation of management a switch 110 kV with the functions DBRS, ARI, FLD (fixing of line disconnecting) 129

40.10 DBRS function 130

40.11 Functions of ARI device 131

40.12 Device of fixing disconnecting and including line (FLD and FLI)) 131

40.13 Automation device of liquidation asynchronous mode (ADLA) 132

40.14 Complete set for the transmission commands RP (relay protection) and SA (special automatic ) 132

40.15 Requirements to the dividing filters for organization HF ductings 133

40.16 Requirement to the joining filter for organization HF channels 133

40.17 Requirements to the radio-frequency cable for joining HF apparatus to the HF highway 134

40.18 Requirement to the devices of determining damage location (DDL) by a wave method 134

40.19 Complete set for the transmission of command RP and SA on FCL 134

40.20 Complete set of defense autotransformers 330 kV on differential, controlled from distance and current principle (basic and dublicate) 135

40.21 Complete set of defense transformers 110 kV on differential, controlled from distance and current principle 136

40.22 Complete set of differential defense of tires 330 kV and 110 kV 137

40.23 Complete set of differential defense bus arrangement 330 kV and 110 kV 137

40.24 Complete set for adjusting and verification equipment of relay protection and special automatic 138

40.25 Low-voltage complete devices (LCD). Closets with the microprocessor terminals of defense 140

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]