- •Gold mining
- •Text 1. Some facts from the history of gold mining
- •Diamond Placer
- •Text 3. La paz placers
- •Text 2. Placer mining вy excavating machinery
- •Fig.1. Ruston-Bycyrus dragline excavator
- •Fig. 2. Dragline making first cut
- •Fig.5. General arrangement of property for dragline mining
- •Text 3. Power shovels
- •Cableways
- •Text 4. Excavating equipment in тнe mid 80s
- •Electric mining shovels
- •Hydraulic excavators
- •Fig. 13. Ransomes and Rapier w2000 walking dragline stripping overburden at phosphate mine in Jordan
- •Fig. 14. Shows the rh120c introduced in 1933 as an intermediate size between the rh75 and rh300, incorporating “Tripower" geometry
- •Text 2. Dredging in the north
- •Stripping
- •Dredging
- •Vocabulary
- •Text 3. Thawing
- •Other operating problems
- •Nodules
- •20° Angle Gave Best Results
- •Fig. 17. Nodule dredge configuration shown was chosen after a series of increasingly complex dredge designs
- •Larger Dredge Lines Cause Problems
- •Dredge Vessel Specifications
- •Ship Positioning By Dead Reckoning
- •10 Tpd Average
- •Fig. 18. Stages in mining diamondiferous gravel
- •Transport
- •Milling
- •Effects
- •What is Cyanide?
- •Prevention/Solution
- •Text 2. Sluicing
- •Sluice Boxes
- •Water Required
- •Tailings
- •Text 3. Excavation and treatment of gravel
- •Fig. 29. Sluicing by direct loading method
- •Fig. 30. Method of working with ample water supply and steep valley
- •Text.2 working of terrace and alluvial deposits
- •Fig. 33. Method of working river terrace and eluvial deposits
- •Fig. 34. Example of exploitation plan
- •Text 2. Hydraulic mining
- •Fig. 35. Sketch of giant or monitor
- •Text 3. Hydraulic elevators
- •Fig. 41. Hendy hydraulic gravel elevator
- •Fig. 42. Section of elevator pit (Joshua Hendy Iron Works)
- •Text 4. Sluice boxes for hydraulicking
- •Text 2. Miscellaneous methods of mining
- •Text 3. Khetri copper complex
- •Text 4. Kherti and kolihan mines
- •Fig. 46. Longituainal section of Kherti mine, showing principal shafts, main levels and stoping areas
- •In Kolihan mine, small footwall ore-shoots are worked by a sub-level top-slicing method using jackhammers and remote controlled Cavo loaders.
- •Shafts at the Kherti and Kolihan mines
- •Fig. 48. The service shaft, Khetri mine
- •Central services
- •Personnel and housing
Text 3. Khetri copper complex
Khetri Copper Complex is a major constituent part of Hindustan Copper Ltd. (HCL), a Government of India enterprise established in November 1967. Other principal HCL units include the Malanjkhand Copper Project - a large new open-pit copper mine in a Madhya Pradesh - and the Indian Copper Complex (ICC), a group of underground copper mines, concentrators, smelter and refinery in Bihar State. Malajkhand and ICC were both described (Mining Magazine, November 1983, pp. 334-41 and pp. 343-53).
Khetri is located in the Jhunjhunu District of Rajasthan some 190 km southwest of Delhi, and 180 km north of Jaipur, the State capital.
The copper deposits were mined in ancient times, some workings dating from the Mauryan Period, over 2000 years ago. The mines were active again in the times of the Moghul Emperors, a report of 1590 referring to them ("Aanai-aAkban", written by Abu Pazal, a courtier of Emperor Akba). More recently they were worked by local people who paid a royalty on production to the Princely State of Khetri. Two mines were functioning in the towns of Siaghana and Khetri until closed by the British in 1869. Regular mining ceased in 1872, although sporadic activity continued until 1910. From 1944 to 1955 the lease was held by the Jaipur Mining Corporation LTD but not worked.
The Geological Survey of India began prospecting the area in 1954 and exploratory mining by the Indian Bureau оf Mines began in 1957. The project was handed over to the National Mineral Development Corporation in 1961 for further investigation.
Initial feasibility studies were completed in 1963; a new source of copper was needed in India, as for almost two decades the national output had remained static at about 10,000 t/y, principally from the Indian Copper Corporation mines Bihar (now HCL's Indian Copper Complex division). There was a pressing need to increase indigenous production to narrow the gap between India's own output and the steadily rising demand.
The decision to proceed with the development of Khetri Copper Complex was taken in 1962. Shaft sinking and mine development began in 1964 anf the first production of ore took place in 1970. The project was transferred to the newly created Hindustan Copper Limited in November 1967.
The finance for the surface installations was not available immediately, and construction of the concentrator and smelter did not begin until 1970. The concentrator came on stream in 1973, followed by the smelter start-up the following year. A fertilizer plant, based on the sulphur acid by-product from the smelter, plus phosphate rock from southern Rajasthan, began production in 1975.
There are four mines in the Khetri Complex - the two major Khetri and Kolihan underground mines, the Chahdmaril open pit, and the 100 t/d Dariba underground mine, with a matching concentrator, in the Alwar District of Rajasthan State, some 220 km away from Khetri. The ultimate capacities of the first three are designed to be 5000 , 3000 and 1000 t/d respectively but very severe power shortages over the last four years have limited output and constrained development, so that the average production in 1983/4 was 3675 t/d (fig.44).
Fig. 44. The map shows the location of the Khetri Copper Complex and gives some indication of regional geology
GEOLOGY
The rocks in the Khetri district belong to the Delhi super-group of Precambrian age, which is sub-divided into the Alwar and Ajabgarh groups. The older Alwar rocks are derived from predominantly arenacous sediments, while the younger Ajabgarh rooks were originally of a more argillaceous nature, the transition between the two being gradational. All these formations are metemorphozed to quartzites, shcists and phyllites. Some intrusive dolerite dykes are present, and veins of quartz and carbonates are common.
The general strike of the formations is NNE-SSW with steep to gentle dips towards the WNW. The economic mineralization which gives rise to the orebodies is mainly localized in the upper parts of the amphibole-chlorite quartzite and garnet-amphibole-chlorite quartz/schist. The mineralization occurs in the form of veins, veinlets, stringers and disseminations (rarely massive), oriented in general parallel to the foliation plane (fig.45).
Fig. 45 Geological section through the Khetri mine showing are lenses (based on a cut-off grade of 0,5% Cu): l - quartzites; 2 - chiorite rock; 3 - metadolerite; 4 - ore-grade mineralization; 5 - quartzveln; 6 – antdalusite shist/phyilites; 7 - aluvium/ scree
In Khetri mine there are two distinct ore lodes, namely in Madhaa (or footwall) lode and the Kudhan (or hanging-wall) lode. The Madhan lode is fairly persistent, containing а number of оre lenses. The Kudhan lode, on the other hand, is narrower, poorer in copper. It is well formed in the central part of the mine. At the kolihan mine, three distinct lode systems have been identified, Lode 1 (South Lode), Lode II (North Lode) and Lode III (East or Footwall Lode). Of these, Lodes, 1 and III are persistent, but Lode II is not persistent in depth.
The feldspar quartzite rocks which form the footwall highly jointed but are, nevertheless, quite competent, the hanging wall consists of phyilites. At the Kolihan mine there is a shear zone in the phillites which poses some atability problems during stoping. There are a number of transverse faults and shear planes, plus a number of longitudinal shears within the area of both underground mines.
Chalcopyrite is the principal copper mineral in the ore. The mineralogical composition of the Khetri and Kolihan ore types, for which the concentrator was designed, are as follows:
Mineral |
Indexes, % |
|
Kherti |
Kolihan |
|
Chalcopyrite Pyrite Pyrrhotite Magnetite Silica |
3 1 7 8 79 |
11,7 0,1 15,7 1,0 71,5 |
The Kharkhara river flows in a valley immediately in the hanging wall of the mineralized rocks in the Khetri mine area. There is some make of water into the mine through transverse faults having access to the river bed. To ensure stability, the ore lenses near the hanging wall have not been worked in the upper levels of the mine.
At the Kolihan mine, although the water table is only a little way below ground surface, no serious water problems have been encountered.
Ore reserves at the two major underground mines and the open pit mine are in Table.
The initial exploration of the deposits was carried out from surface by diamond core drilling, and there is a continuous on-going program of core drilling from underground to prove reserves: 1,800 holes total 140000 m have yielded 6280 intersections with ore.
Ore reserves at Khetri, Kolihan and Chandmari mines
Category |
Kherti Kolihan Chandmari |
|||||
MT |
Cu |
MT |
Cu |
MT |
Cu |
|
Proved Probable Inferred
|
10,48 6,85 22,11
|
0,98 0,91 0,93 |
13,08 5,88 9,93 |
1,62 1,14 1,18 |
- 1,70 - |
- 1,24 - |
Note Cut-off grade for all categories 0,50% Cu
The strike length of the deposits worked by the Knetre mine is about 3,6 km, the workings being divided into North, Central and South and blocks. The Kolihan workings are located on three lodes and extend over a total length of 600 m. The distance between the shaft systems of the two mines is about 7,6 km. (http://www.indiamart.com/hindustan-copperltd/)
COMPREHENSION CHECK
Exercise 15. Fill in the missing words.
The copper deposits were minted … ancient times, some workings dating ... the Mauryan Period, over 2000 years ago.
Regular mining ... in 1972.
Initial feasibility studies were completed in ...
The decision ... the development of Khetri Copper Complex was taken ... 1962.
The finance ... the surface installations was not available immediately and construction ... ... did not begin... 1970.
Exercise 16. Look through the text and find the English equivalents, try to remember them.
разрабатывать; начинать; заканчивать; продолжать; главным образом; проходить выработку; ствол; плавить; плавильный завод; действовать; доступ; встречаться (сталкиваться) с проблемой; увеличиваться; спрос.
Exercise 17. Match the parts of sentences.
|
a) followed by the smelter start-up the following year. b) some 190 km southwest of Delhi. c) the two major Khetri and Kolihan underground mines. d) the gap between India's own output and the steadily rising demand. e) have not been worked in the upper levels of the mine.
|
SPEAKING
Exercise 18. Make questions to the sentences and ask them your partner.
The Geological Survey of India began prospecting the area in 1954, and exploratory mining by the Indian Bureau of Mines began in 1957.
Shaft sinking and mine development began in 1964 and the first production of ore took place in 1970.
At the Kolihan mine there in a shear zone in the phyllites which poses some stability problems during stoping.
The initial exploration of the deposits was carried out from the surface by diamond core drilling.
Exercise 19. Render in English
Медный комплекс Кетри был основан в ноябре 1967 года.
Он расположен в 190 км к юго-востоку от Дели.
Медные месторождения в Индии разрабатываются с древних времен.
Геологическая служба Индии начала разведку этой области в 1954 году.
Первоначальные исследования были завершены в 1963 г. Индия нуждалась в новом источнике меди.
Решение разрабатывать медь в Кетри было принято в 1962 году.
Проходка первого ствола началась в 1964 году.
Первая руда была получена в 1970 году.
Exercise 20. Discuss the questions with the partner.
When was Khetri Complex established?
Where is Khetri located?
Since what times were the copper deposits mined in India?
When did the Geological Survey of India begin prospecting the area?
When was initial feasibility study completed?
When did the first production of ore take place?
When did the concentration come on stream?
How many mines are there in the Khetri Complex?
What is their capacity?
What age do the rocks Kherti belong to?
VOCABULARY
access - доступ
adit - штольня
headings - грудь лайok
stoping method - метод очистной выемки
stope - очистной забой, целик, закладка
skid-mounted rig - смонтированная на направляющем рельсе вышка
toe - карман, подошва,
sub-level - подэтаж
sub-level development - разработке подэтажа
cross-cut draw point - место, где производится выемка угля
rocker shovel - механическая лопата
footwall - подошва выработки
oreshoot - скат
jackhammer - перфоратор
dilution - разбавление
envisage - предусматривать
jaw crusher - щековая дробилка
sump - отстойник
booster - вентилятор
rigid - жесткий
well - скважина
sink(sunk) - опускать, проходить
aquifers - водоносный горизонт
potable water - питьевая вода
workshop - цех
maintenance - монтаж, наладка
repair - ремонт
carpentry shop - деревообделочный цех
turnover - оборот
shift - смена
Exercise 21. Find the meaning of the words and try to remember them.
hoisting; adit; bedrock; level; race; stoping method; access; incline; ridge; hard; soft; mouth; heading; well; sunk; maintenance; consumption; overlain; capping; lava; working; room and pillar system; shaft; driven commence; mouth; development; sub-level; shovel; footwall; charge; cross-cut; deliver; provide; fan; flow; aquifer, sump.
READING
Exercise 22. Read the text below looking for the main ideas concerning Kherti and Kolihan mines