Q. 479: Given the following sets of test management terms (v-z), and activity descriptions (1-5), which one of the following best pairs the two sets?

v - Test control

w - Test monitoring

x - Test estimation

y - Incident management

z - Configuration control

1 - Calculation of required test resources

2 - Maintenance of record of test results

3 - Re-allocation of resources when tests overrun

4 - Report on deviation from test plan

5 - Tracking of anomalous test results

A. v-3,w-2,x-1,y-5,z-4

B. v-2,w-5,x-1,y-4,z-3

C. v-3,w-4,x-1,y-5,z-2

D. v-2,w-1,x-4,y-3,z-5

Q. 480: In a system designed to work out the tax to be paid:

An employee has £4000 of salary tax free. The next £1500 is taxed at 10% The next £28000 is taxed at 22%

Any further amount is taxed at 40%

To the nearest whole pound, which of these is a valid Boundary Value Analysis test case? A. £1500

B. £32001

C. £33501

D. £28000

Q. 481: Which of the following is NOT true of test coverage criteria?

A. Test coverage criteria can be measured in terms of items exercised by a test suite. B. A measure of test coverage criteria is the percentage of user requirements covered. C. A measure of test coverage criteria is the percentage of faults found.

D. Test coverage criteria are often used when specifying test completion criteria.

Q. 482: Analyze the following highly simplified procedure:

Ask: "What type of ticket do you require, single or return?" IF the customer wants ‘return’

Ask: "What rate, Standard or Cheap-day?"

IF the customer replies ‘Cheap-day’

Say: "That will be £11:20" ELSE

Say: "That will be £19:50" ENDIF

ELSE

91

Istqb Sample Papers [2010 -2011]

Say: "That will be £9:75" ENDIF

Now decide the minimum number of tests that are needed to ensure that all the questions have been asked, all combinations have occurred and all replies given.

A. 3

B. 4

C. 5

D. 6

Q. 483: Which of the following should NOT normally be an objective for a test?

A. To find faults in the software.

B. To assess whether the software is ready for release. C. To demonstrate that the software doesn’t work.

D. To prove that the software is correct.

Q. 484: Enough testing has been performed when:

A. Time runs out.

B. The required level of confidence has been achieved.

C. No more faults are found.

D. The users won’t find any serious faults.

Q. 485: Which of the following is the best source of Expected Outcomes for User

Acceptance Test scripts?

A. Actual results

B. Program specification

C. User requirements

D. System specification

Q. 486: Which of the following are disadvantages of capturing tests by recording the actions of a manual tester?

i The script may be unstable when unexpected events occur.

ii Data for a number of similar tests is automatically stored separately from the script.

iii Expected results must be added to the captured script.

iv The captured script documents the exact inputs entered by the tester.

v When replaying a captured test, the tester may need to debug the script if it doesn’t play correctly.

A. i, iii, iv, v. B. ii, iv and v. C. i, ii and iv. D. i and v.