Istqb Sample Papers [2010 -2011]

D. All of the above

Q. 50: Measurement dysfunction is a problem because:

A. Even though the numbers you look at appear better, to achieve these numbers, people are doing other aspects of their work much less well.

B. We don't know how to measure a variable (our measurement is dysfunctional) and so we don't know how to interpret the result.

C. You are measuring the wrong thing and thus reaching the wrong conclusions. D. All of the above.

Q. 51: Important consequences of the impossibility of complete testing are (Choose one or more answers):

A. We can never be certain that the program is bug free.

B. We have no definite stopping point for testing, which makes it easier for some managers to argue for very little testing.

C. We have no easy answer for what testing tasks should always be required, because every task takes time that could be spent on other high importance tasks.

D. All of the above.

Q. 52: Poor software characteristics are

A. Only Project risks

B. Only Product risks

C. Project risks and Product risks

D. Project risks or Product risks

Q. 53: System testing should investigate

A. Non-functional requirements only not Functional requirements B. Functional requirements only not non-functional requirements C. Non-functional requirements and Functional requirements

D. Non-functional requirements or Functional requirements

Q. 54: Contract and regulation testing is a part of

A. System testing

B. Acceptance testing C. Integration testing D. Smoke testing

14

Istqb Sample Papers [2010 -2011]

Q. 55: Find the correct flow of the phases of a formal review

A. Planning, Review meeting, Rework, Kick off

B. Planning, Individual preparation, Kick off, Rework

C. Planning, Review meeting, Rework, Follow up

D. Planning, Individual preparation, Follow up, Kick off

Q. 56: Which is not the testing objectives

A. Finding defects

B. Gaining confidence about the level of quality and providing information

C. Preventing defects.

D. Debugging defects

Q. 57: Maintenance releases and technical assistance centers are examples of which of the following costs of quality?

A. External failure B. Internal failure C. Appraisal

D. Prevention

Q. 58: Which is not the project risks

A. Supplier issues

B. Organization factors

C. Technical issues

D. Error-prone software delivered

Q. 59: Bug life cycle

A. Open, Assigned, Fixed, Closed B. Open, Fixed, Assigned, Closed C. Assigned, Open, Closed, Fixed D. Assigned, Open, Fixed, Closed

Q. 60: Who is responsible for document all the issues, problems and open point that were identified during the review meeting

A. Moderator

B. Scribe

C. Reviewers

D. Author

15

Istqb Sample Papers [2010 -2011]

Q. 61: ‘X’ has given a data on a person age, which should be between 1 to 99. Using

BVA which is the appropriate one

A. 0,1,2,99

B. 1, 99, 100, 98

C. 0, 1, 99, 100

D. –1, 0, 1, 99

Q. 62: Which is not a testing principle

A. Early testing

B. Defect clustering C. Pesticide paradox D. Exhaustive testing

Q. 63: A project that is in the implementation phase is six weeks behind schedule.

The delivery date for the product is four months away. The project is not allowed to slip

the delivery date or compromise on the quality standards established for his product. Which of the following actions would bring this project back on schedule?

A. Eliminate some of the requirements that have not yet been implemented. B. Add more engineers to the project to make up for lost work.

C. Ask the current developers to work overtime until the lost work is recovered. D. Hire more software quality assurance personnel.

Q. 64: The Testing will be performed by the people at client own locations

A. Alpha testing

B. Field testing

C. Performance testing

D. System testing

Q. 65: Which of the following is the standard for the Software product quality

A. ISO 1926

B. ISO 829

C. ISO 1012

D. ISO 1028

Q. 66: Which is not a black box testing technique

16