Добавил:
Upload
Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз:
Предмет:
Файл:CHAPTER_4.docx
X
- •Air sampling and industrial hygiene engineering. Martha j. Boss & Dennis w. Day
- •4.1 Definitions
- •4.2 Example—outline of bulk sampling qa/qc procedure
- •4.3 Example—outline of the niosh 7400 qa procedure
- •4.3.1 Precision: Laboratory Uses a Precision of 0.45
- •4.3.2 Precision: Laboratory Uses a Precision sr that is Better Than 0.45
- •4.3.3 Records to Be Kept in a qa/qc System
- •4.3.4 Field Monitoring Procedures—Air Sample
- •4.3.5 Calibration
- •4.4 Sampling and analytical errors
- •95% Confident That the Employer Is in Compliance
- •95% Confident That the Employer Is not in Compliance
- •4.5 Sampling methods
- •4.5.1 Full-Period, Continuous Single Sampling
- •4.5.2 Full-Period, Consecutive Sampling
- •4.5.3 Grab Sampling
- •4.6 Calculations
- •4.6.1 Calculation Method for a Full-Period, Continuous Single Sample
- •4.6.2 Sample Calculation for a Full-Period, Continuous Single Sample
- •4.6.3 Calculation Method for a Full-Period Consecutive Sampling
- •4.7 Grab sampling
- •4.8 Saes—exposure to chemical mixtures
- •5.1 Baseline risk assessment
- •5.2 Conceptual site model
- •5.2.1 Source Areas
- •5.2.2 Possible Receptors
- •5.3 Chemicals of potential concern
- •5.4 Human health blra criteria
- •5.5 Toxicity assessment
- •5.6 Toxicological profiles
- •5.7 Uncertainties related to toxicity information
- •5.8 Potentially exposed populations
- •5.8.1 Exposure Pathways
- •5.8.2 Sources
- •5.9 Environmental fate and transport of copCs
- •5.10 Exposure points and exposure routes
- •5.11 Complete exposure pathways evaluated
- •5.12 Ecological risk assessment
- •5.13 Data evaluation and data gaps
- •5.14 Uncertainties
- •5.14.1 Uncertainties Related to Toxicity Information
- •5.14.2 Uncertainties in the Exposure Assessment
- •5.15 Risk characterization
- •5.16 Headspace monitoring—volatiles
- •5.18 Industrial monitoring—process safety management
- •5.19 Bulk samples
- •6.1 Fungi, molds, and risk
- •6.1.1 What Is the Difference between Molds, Fungi, and Yeasts?
- •6.1.2 How Would I Become Exposed to Fungi That Would Create a Health Effect?
- •6.1.3 What Types of Molds Are Commonly Found Indoors?
- •6.1.4 Are Mold Counts Helpful?
- •6.1.5 What Can Happen with Mold-Caused Health Disorders?
- •6.2 Biological agents and fungi types
- •6.2.1 Alternaria
- •6.3 Aspergillus
- •6.4 Penicillium
- •6.5 Fungi and disease
- •6.6 Fungi control
- •6.6.1 Ubiquitous Fungi
- •6.6.2 Infection
- •6.6.3 Immediate Worker Protection
- •6.6.4 Decontamination
- •6.6.5 Fungi and voCs
- •6.6.6 Controlling Fungi
- •6.7 Abatement
- •Indoor Air Quality and Environments
- •7.1 Ventilation design guide
- •7.2 Example design conditions guidance
- •7.2.1 Outside Design Conditions
- •7.2.2 Inside Design Conditions
- •7.3 Mechanical room layout requirements
- •7.4 Electrical equipment/panel coordination
- •7.5 General piping requirements
- •7.6 Roof-mounted equipment
- •7.7 Vibration isolation/equipment pads
- •7.8 Instrumentation
- •7.9 Redundancy
- •7.10 Exterior heat distribution system
- •7.10.1 Determination of Existing Heat Distribution Systems
- •7.10.2 Selection of Heat Distribution Systems
- •7.10.2.1 Ag Systems
- •7.10.2.2 Cst Systems
- •7.10.2.3 Buried Conduit (preapproved type)
- •7.10.2.4 Buried Conduit (not preapproved type)
- •7.11 Thermal insulation of mechanical systems
- •7.12 Plumbing system
- •7.12.1 Piping Run
- •7.13 Compressed air system
- •7.13.1 Compressor Selection and Analysis
- •7.13.2 Compressor Capacity
- •7.13.3 Compressor Location and Foundations
- •7.13.4 Makeup Air
- •7.13.5 Compressed Air Outlets
- •7.13.6 Refrigerated Dryer
- •7.14.5 Outdoor Air Intakes
- •7.14.6 Filtration
- •7.14 Air supply and distribution system
- •7.14.1 Basic Design Principles
- •7.14.2 Temperature Settings
- •7.14.3 Air-Conditioning Loads
- •7.14.4 Infiltration
- •7.14.7 Economizer Cycle
- •7.15 Ductwork design
- •7.15.3 Evaporative Cooling
- •7.16 Ventilation and exhaust systems
- •7.16.1 Supply and Exhaust Fans
- •7.17 Testing, adjusting, and balancing of hvac systems
- •7.18 Ventilation adequacy
- •7.19 Laboratory fume hood performance criteria
- •7.20 Flow hoods
- •7.21 Thermoanemometers
- •7.22 Other velometers
7.22 Other velometers
Other velometers include rotating-vane and swinging vane velometers. Note: Barometric pressure and air temperature should be noted when using air velocity meters.
Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]
