- •Введение
- •Part 1. Ordering Fuels and Oils
- •Introduction
- •Marine Fuel Oil Standards
- •Heavy Fuel Oils
- •Marine Diesel Oils
- •1. Study the names of fuels.
- •4. Discuss with the partner the fuel oil you need (let him play the part of the representative of fuel oil supplying company).
- •5. Study the expressions and make up a short dialogue discussing the prices for fuel oil:
- •6. Ask for a discount. Think over what the reasons for a discount can be, if the prices for the fuel are fixed.
- •7. There are different ways of oil delivery. The expressions below will help you to discuss its terms.
- •8. Make up short dialogues where the following expressions can be used:
- •9. Translate the phrases into English, use the given information in your own dialogues:
- •2. Read the expressions, memorize them and use in the dialogues.
- •3. Using the expressions given above, ask the representative of fuel oil supplying company for a certain grade of fuel.
- •10. Make up the dialogue based on the situation:
- •4. Scan the text to pick out the information about:
- •6. Make up short dialogues between the Chief Engineer and the Third Engineer using phrases from the models above.
- •Part 3. Bunkering Procedure Arrangement
- •1. Study and memorize the phrases to be used when arranging for bunkering.
- •2. With the help of the above phrases translate into English the following questions and statements which may be used by a representative: a) of the fuel supplier:
- •B) of the ship:
- •3. Read the text Bunkering Guide. Enumerate the issues that should be discussed before taking the fuel.
- •Delivery Procedure of Mobil Company
- •4. Pair work: Discuss with your partner the arrangement of the fuel delivery process (you play the part of the Chief Engineer and let your partner play the part of a bunker supplier):
- •5. Translate the phrases into English, reproduce the dialogues:
- •Flash Point
- •Pour Point
- •Sulphur
- •Table 1
- •International standard iso 8217 Petroleum Products – Fuels (Class f) – Specifications of marine fuels
- •Bunker Delivery Note
- •Литература
4. Scan the text to pick out the information about:
a) preparing ship's tanks for receiving a new bunker;
b) getting ship's filling and transfer systems ready for fuelling operations;
c) actions to be taken to avoid an accidental spillage;
d) necessary tools and special devices to ensure safe handling of the fuel hose.
5. Make up phrases which may be used by a Chief Engineer as instructions to a Third Engineer while preparing to receive fuel on board (Model 1), phrases which may be used as reports about the actions already taken (Model 2) or questions to find out how things are going on (Model 3).
Model 1: to sound the tanks > Have you all the tanks sounded accurately?
to place the plug securely into the quick closing valve;
to empty the aft port tank first;
to burn both settlers down to between 4 and 6 feet;
to place wooden plugs in all scuppers;
to prepare a bag of sawdust and a bag of rags;
to test the phones.
Model 2: a) proper wrenches to be provided > Proper size wrenches have been provided.
b) to open all the suction valves > We have opened all the valves on the suction side. (We have all the suction valves opened.)
a new gasket for the fuel connection to be prepared;
the scuppers to be plugged to prevent any spillage over the ship's side;
the settlers to be burnt down to between 4 and 6 feet;
the discharge valves of the fuel tanks to be shut and sealed;
to take the ullage of the tank which is partially filled;
to open the crossover from the filling to the transfer main;
to get a proper fire extinguisher ready;
to make all the arrangements in accordance with the international requirements.
Model 3: a) to check the filling system > Have you checked the filling system?
b) the discharge valve to be sealed > Is the discharge valve sealed?
to get a bag of sawdust ready to prevent spillage;
to prepare a block and tackle for hooking up the hose;
to place wooden plugs in all scuppers to avoid spillage over the ship's side;
to take the necessary fire precautions;
the quick closing valve to be securely plugged;
the fuel in the settlers to be burnt down to between 4 and 6 feet;
all the valves on fuel oil manifold to be opened;
the phone connection to be tested.
6. Make up short dialogues between the Chief Engineer and the Third Engineer using phrases from the models above.
Example: – Have the aft tank emptied first.
– We have already done it. And besides I have taken the ullage of the tank which is partially filled.
– Is the quick closing valve securely plugged?
– Certainly.
7. Play out a conversation which might occur between the Chief Engineer and the Third Engineer while discussing preparation for bunkering. Use the words, phrases and ideas from the text and exercises above to discuss what has already been done and what is still left to be done. You may start with the following:
Ch.Eng.: |
So, tomorrow we are going to take bunker. The supplier company has confirmed our order for 1100 tons of IFO-180. Have you made all necessary arrangements? |
3-d Eng: |
Yes, Chief. I know the bunkering boat will be brought alongside our ship by 10 a.m. We have already sounded the aft tanks, emptied the port tank and have its filling and discharge connections checked. |
Ch.Eng.: |
According to the International requirements you are to have them shut and sealed. … |
