Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
PORT CARGO HANDLING MACHINERY.doc
Скачиваний:
5
Добавлен:
01.07.2025
Размер:
3 Мб
Скачать
☆

9. Insert the proper word (choose from the words given below)

  1. It was decided to use аn in-house built … engine.

  2. Liebherr’s factory in Switzerland also … engines for the smaller range of MHCs.

  3. The transmission is fully hydrostatic with … acceleration/deceleration.

  4. It was required that the engine fully meet the Tier 2 … limits.

  5. Liebherr claims that the hydrostatic … provides for excellent fuel есоnomу.

  6. The unique suspension is designed for … of performance.

  7. Another unique … of the LRS 645 is the single hydraulic ram/luffing cylinder controlling the bооm.

  8. But the engineers were convinced of the … performance of their design.

  9. A comfortable operator is а more … operator and а major component in achieving high levels of output.

  10. The LRS 645 was launched in spring 2004 and was … successful.

  11. There will, when necessary, bе very prompt … of spares and service.

  12. There will bе discussions to … whether another model would bе appropriate.

(availability, determine, diesel, engineering, emission, feature, immediately, longevity, manufactures, productive, stepless, transmission)

10. Give English equivalents

мощностью 45 тонн, отвечать требованиям, убирающаяся монтажная площадка, производить двигатели, бесступенчатое ускорение, ограничение излучения, обеспечивать экономию топлива, уникальная подвеска, цилиндр гидроподъёмника, технические характеристики, усиленная безопасность, улучшенный обзор оператора, современные обтекаемые формы, испытательный полигон, продлить аренду, наличие запчастей и обслуживания

Сheck-up test

1. Укажите буквой соответствующий предлог

1. The new machine will have a capacity … 8 tonnes.

a. in b. on c. at d. of

2. The machine will be fitted … a telescopic side spreader.

a. with b. without c. to d. at

3. The unit has an electronic feature asking … a password.

a. to b. for c. from d. with

4. This includes cameras … the spreader and for the rear view.

a. on b. between c. with d. from

5. They have central greasing … chassis, boom and spreader.

a. with b. after c. for d. at

6. The plant is located … the mountains and the highway.

a. with b. from c. between d. after

7. The top box in the back row can be handled … moving any other rows.

a. between b. without c. from d. of

8. LRS 645 is an interesting addition … the available machines.

a. at b. about c. from d. to

9. Liebherr has four units … trials in northern Europe.

a. at b. in c. with. d. on

10.Hydrostatic transmission provides … excellent fuel economy.

a. of b. for c. about d. at

2. Укажите буквами пары синонимов

  1. attention – a. consideration

  2. capacity – b. details

  3. currently – c. double

  4. data – d. equipped

  5. demand – e. fast

  6. engineering – f. first

  7. fitted – g. grow

  8. initial – h. information

  9. manufacture – i. leasing

  10. nurture – j. leverage

  11. prompt – k. now

  12. raise – l. output

  13. rental – m. plan

  14. schedule – n. produce

  15. specification – o. provide

  16. supply – p. requirement

  17. trial – q. technical

  18. triopoly – r. test

  19. twin – s. three

  20. want – t. will

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]