Chief of of of f.I.O.

Offers and actions in the Plan of quality of accumulator plant on 201 __ year

No. software

Purpose

Name of the offer

Resources

Estimated efficiency

1

2

3

4

5

1.

Obtaining the certificate of QMS on production of accumulator plant

To develop documentation of QMS on production of accumulator plant

1. Presence of the trained personnel for work on development and deployment of QMS on production of batteries

2.

Carrying out internal audit according to documentation of QMS AZ

To train the expert

1. Existence of financial means for training on courses

3.

Construction of the main and auxiliary offices of AZ

1. Chemical protective works and overlapping of the main case and powder office. 2. Installation of equipment, power supply, 3. Construction of treatment facilities, 4. Installation of 2 compressors, monoblocks. Pusko-adjustment works

Firm "Technefin of JSC ShHM firm of "Sovema"

191000 t.t

4.

Receiving production with the added cost - batteries of all brands

Commissioning of the main production of AZ

1. The trained personnel for carrying out technical processes 2. Existence of the equipment and production rooms 3. Security with raw materials, to reagents, means of labor 4. Security with energy resources, transport and communication

In 3 months-93250 of t tg.

Director of az f.I.O

I claim:

President

JSC Kaztsink

__________ F.I.O.

"____" ____________ 201 __

Plan of quality of jsc Kaztsink

No. of a payment order

Name of action

Purpose

1. Responsible 2 Performer

Performance terms

Expenses

Than has to work will end

Report on performance

Note

1

To develop documentation of QMS on production of a zinc concentrate, production of accumulator plant

Obtaining certificates of QMS on production of a zinc concentrate of OF, production of accumulator plant

1. Head of department of FOXES, ISO 2. Leading expert of department of FOXES, ISO 3. Responsible for quality of AZ

December of 200_ years

1. On consulting services 2. Certified audit

Obtaining certificates of QMS on production of OF, AZ

In process of performance of work

2

To train experts on courses of internal auditors

1. Obtaining certificate of the internal auditor 2. Carrying out internal audits of the developed QMS on OF, AZ

1. Head of department of FOXES, ISO 2. Leading expert of department of FOXES, ISO 3. Responsible for quality for OF, Z

Prior to carrying out certified audit

1. Costs of training

1. Presence of the trained internal auditors 2. Reports on an audit inspection, acceptance of the correcting actions for decrease in amount of discrepancies at certified audit

In process of performance of work

3.

On OF: To reduce the level of inappropriate production by 0,2% in relation to indicators of last year

To reduce quantity of the rejected zinc concentrate

1. Chief of OF 2. Technologist, senior master and masters of changes of OF

On financial year

Decrease in quantity of the rejected production by 0,2%

Results of activity of factory on the annual reporting

To establish a roar and a crusher of average crushing after SMD-118 crusher

To eliminate inhomogeneity of the zinc ore coming to an enrichment cycle

1. Chief of OF 2. Art. of mechanics

4 quarters

Stabilization of fractional composition of the zinc ore arriving on OF

By results of the performed works

To get and install the spiral qualifier for return of drainages

To reduce zinc losses

1. Chief of OF 2. Art. of mechanics

3 quarters

Decrease in losses of zinc with drainage waters

By results of the performed works

It is established in the 3rd decade of July

To get new kontsentratometr the RKB-2, RKB-3 type

For increase of accuracy of results of the analysis on the content of zinc

1. Chief of OF 2. Chief of GMO

1 quarter

Increase of accuracy of results of analyses on the content of zinc in process products

By results of the performed works

It is acquired in March

To get a drying cabinet of SNOL 1,5

For performance of indicators on water-soluble salts when drying test of a zinc concentrate

1. Chief of OF

3 quarters

Compliance of humidity of a zinc concentrate to the demanded norms

By results of the performed works

To replace impeller, stators flotomashin

For improvement of quality of foamy flotation.

1. Chief of OF 2. Mechanic of OF

Within financial year

Improvement of parameters of foamy flotation

By results of the performed works

To establish new scales on zatarochny knot of a ready zinc concentrate

For improvement of quality of weighing of finished goods

1. Chief of OF 2. Mechanic of OF

2 quarters

Improvement of quality of weighing of finished goods

By results of the performed works

Control scales of-5 tons are established

5.

On AZ: 1. Chemical protective works and overlapping of the main case and powder office. 2. Installation of equipment, power supply, 3. Construction of treatment facilities, 4. Installation of 2 compressors, monoblocks. Pusko-adjustment works

Construction of the main and auxiliary offices of AZ

1. F.I. 2. Technefin firm, JSC ShHM, Sovema Firm

3 quarters

191000 thousand tn

Commissioning of the AZ capital equipment

By results of the performed works

Commissioning of the main production of AZ

Receiving production with the added cost - batteries of all brands

F.I.O

October 200_

Costs of construction-251000 of one thousand tn Costs of production AB-188000 of thousand tons

Receiving additional products

By results of the performed works

Developed:

Director of E and PR of F.I.O.

It is coordinated:

Representative of the guide to QMS F.I.O

Chief of OF F.I.O

Director of AZ F.I.O