  1. Define the following terms in English:

  1. fleet

  1. carrier

  1. forecast

  1. suspend

c. In the text find the words that mean the same as the following words:

  1. predict

  1. expect

  1. in each year

  1. in reality

  1. constant

  1. lately

d. Match words to make collocations:

  1. delivery

  1. capacity

  1. final

  1. fleet

  1. annual

  1. date

  1. surplus

  1. growth

  1. delivery

  1. schedule

  1. idle

  1. assignment

  1. service

  1. payment

e. Complete the table with correct word forms:

Verb

Noun

Adjective

negotiation

  1. suspend

cancellation

Case Study

Case of Malard Manufacturing Company

Read the case and discuss the following questions in groups. Come up with a solution to the problem.

  1. What is the balance between vertical and horizontal structure in Malard manufacturing?

  2. Is it appropriate that department managers always turn to the executive vice president for help rather than to one another?

  3. If you were Ms. Crandell, how would you resolve this problem? What could you do to facilitate production of the CV305 over the next 30 days?

  4. What structural changes would you recommend to prevent these problems in future new-product developments? Would a smaller span of control help? A project manager with responsibility for coordinating the CV305? A task force?

Mallard Manufacturing Company produces control valves that regulate flows through natural gas pipelines. Mallard has approximately 1,400 employees and has successfully produced a standard line of control valves that are price competitive in the industry. However, whenever the production of a new control valve is required, problems arise. Developments in electronics, metallurgy, and flow control theory require the introduction of new products every year or two. These new products have been associated with interdepartmental conflict and disagreement.

Consider the CV305, which is in process. As usual, the research and development group developed the basic design, and the engineering department converted it into a prototype control valve. Now the materials department must acquire parts for the prototype and make plans for obtaining parts needed for production runs. The production department is to manufacture and assemble the product, and marketing is responsible for sales.

Department heads believe that the future work on the CV305 should be done simultaneously instead of sequentially. Marketing wants to provide input to research and development so that the design will meet customer needs. Production insists that the design fit machine limitations and be cost efficient to manufacture – indeed, it wants to speed up development of the final plans so that it can acquire tolling to be ready for standard production. Engineering, on the other hand, wants to slow down development to ensure that specifications are correct and have thoroughly testes.

All of these controversies with the CV305 exist right now. Department managers are frustrated and becoming uncommunicative. The research and development and engineering departments are keeping their developmental plans secret, causing frustration for the other departments. Moreover, several department managers are new and inexperienced in new product development. Ms. Crandell, the executive vice president, likes to keep tight control over the organization. Department managers must check with her before making major decisions. However, with the CV305, she has been unable to keep things running smoothly. The span of control is so large that Crandell has no time to personally shepherd the CV305 through the system.

On November 1, Crandell received a memo from the marketing department head. It said, in part,

The CV305 must go to market immediately. This is urgent. It is needed now because it provides the precision control our competitors’ products already have. Three of our salespeople reported that loyal customers are about to place orders with competitors. We can keep this business if we have the CV305 ready for production in 30 days.

Translation

Translate the sentences focusing on the underlined terms.

Order

  1. Open order is an active manufacturing order or an unfilled customer order.

  2. Order procurement determines the policy with regard to the steps to be followed in order to motivate the external cus­tomers to buy.

  3. Allocated material is assigned to a spe­cific order that has already been released.

  4. Blanket order means a long-term commitment to a vendor for material against which short-term releases will be generated to satisfy requirements.

  5. BQ system is an ordering system with a fixed reorder level 'B', variable order moments and a fixed order quantity "Q”.

Packing

  1. Shipping marks are shown on individual packages to designate the consignee, the destination and additional information pertaining to transport and transaction.

  2. A shop packet may include a manufacturing order, operations sheets, engineering prints, picking lists, move tickets, inspection tickets, time tickets, and others.

  3. Stacking height is the number of packages that are or may be stacked on top of each other.

  4. Standard pallet quantity is a number of packing units of a particular product type which is to be placed on a pallet of a given type.

  5. A unit load consists of items or packages held together by one or more means and shaped or fitted for handling, transporting, stacking and storing as a unit.