Добавил:
Upload Опубликованный материал нарушает ваши авторские права? Сообщите нам.
Вуз: Предмет: Файл:
ER-6_06-08_Manual.docx
Скачиваний:
1
Добавлен:
01.07.2025
Размер:
35 Мб
Скачать
☆

Evaporative Emission Control System (California Model)

The Evaporative Emission Control System routes fuel va- pors from the fuel system into the running engine or stores the vapors in a canister when the engine is stopped. Al- though no adjustments are required, a thorough visual in- spection must be made at the intervals specified by the Pe- riodic Maintenance Chart.

Parts Removal/Installation

• To prevent the gasoline from flowing into or out of the canister, hold the separator perpendicular to the ground.

• Connect the hoses according to the diagram of the sys-

tem (see Cable, Wire, and Hose Routing section in the

Appendix chapter). Make sure they do not get pinched or kinked.

Hose Inspection

• Refer to the Evaporative Emission Control System In- spection in the Periodic Maintenance chapter.

Separator Inspection

• Refer to the Evaporative Emission Control System In- spection in the Periodic Maintenance chapter.

Separator [A]

Evaporative Emission Control System (California Model)

Separator Operation Test

• Connect the hoses to the separator, and install the sepa- rator on the motorcycle.

• Disconnect the breather hose from the separator, and in-

ject about 20 mL (0.68 US oz.) of gasoline [A] into the

separator [B] through the hose fitting.

• Disconnect the fuel return hose [C] from the fuel tank [D].

• Run the open end of the return hose into the container

and hold it level with the tank top [E].

• Start the engine, and let it idle.

If the gasoline in the separator comes out of the hose, the

separator works well. If it does not, replace the separator with a new one.

Canister Inspection

• Refer to the Evaporative Emission Control System In- spection in the Periodic Maintenance chapter.

NOTE

○The canister [A] is designed to work well through the

motorcycle’s life without any maintenance if it is used

under normal conditions.

Cooling System Table of Contents

Exploded View........................................................................................................................ 4-2

Coolant Flow Chart................................................................................................................. 4-4

Specifications ......................................................................................................................... 4-6

Special Tools .......................................................................................................................... 4-7

Coolant ................................................................................................................................... 4-8

Coolant Deterioration Inspection....................................................................................... 4-8 4

Coolant Level Inspection................................................................................................... 4-8

Coolant Draining ............................................................................................................... 4-8

Coolant Filling ................................................................................................................... 4-8

Pressure Testing ............................................................................................................... 4-8

Cooling System Flushing .................................................................................................. 4-9

Coolant Reserve Tank Removal/Installation ..................................................................... 4-9

Water Pump............................................................................................................................ 4-10

Water Pump Removal....................................................................................................... 4-10

Water Pump Installation.................................................................................................... 4-10

Mechanical Seal Inspection .............................................................................................. 4-11

Water Pump Housing Disassembly .................................................................................. 4-11

Water Pump Housing Assembly ....................................................................................... 4-11

Impeller Assembly............................................................................................................. 4-12

Pump Impeller Inspection ................................................................................................. 4-12

Radiator.................................................................................................................................. 4-13

Radiator and Radiator Fan Removal ................................................................................ 4-13

Radiator and Radiator Fan Installation ............................................................................. 4-14

Radiator Inspection ........................................................................................................... 4-14

Radiator Cap Inspection ................................................................................................... 4-14

Radiator Filler Neck Inspection ......................................................................................... 4-15

Thermostat ............................................................................................................................. 4-16

Thermostat Removal......................................................................................................... 4-16

Thermostat Installation...................................................................................................... 4-16

Thermostat Inspection ...................................................................................................... 4-16

Hose and Pipes ...................................................................................................................... 4-18

Hose Installation ............................................................................................................... 4-18

Hose Inspection ................................................................................................................ 4-18

Water Temperature Sensor .................................................................................................... 4-19

Water Temperature Sensor Removal/Installation ............................................................. 4-19

Water Temperature Sensor Inspection ............................................................................. 4-19

Соседние файлы в предмете [НЕСОРТИРОВАННОЕ]